About this Project
LKB was responsible for the engineering, design and drafting for the replacement of the entire electrical power and lighting systems at the bridge. This included the installation of new distribution panels at the maintenance building and bridge pier electrical rooms, a new underground cable distribution system to the west abutment. All new conduit and cable tray installed on the bridge maintenance catwalk along with new maintenance receptacles and the replacement of the entire lighting system on the bridge, which also included both east and west approaches. Added new power supply and panels at auxiliary buildings and replaced navigational lighting supplies.
Location
Kingston, NY
Client
New York State Bridge Authority
Completion
2012