LKB was retained by the Town of Hempstead to provide engineering services including design, permits, and construction support services. This project was for improvements to protect portions of the south shore community of Seaford, NY from the impacts of flooding due to stormwater and tidal action. The project was funded through the Governor’s Office of Storm Recovery (GOSR).

These locations were severely impacted and damaged by the effects of superstorm Sandy and experience frequent flooding. The improvements included reconstruction of the roadway segments to raise their gutter elevation, new drainage structures and pipe along with reconstruction of outfalls and bulkheads, installation of check valves, and stormwater treatment bioretention areas. The scope of work included a study of existing storm drain facilities, preparation of required permit applications and documentation, as well as a drainage report, a comprehensive design report and preparation of contact documents (plans, specifications and estimates).

Upon completion and acceptance of the design and final contract documents, LKB provided services during the bidding phase, which included responding to inquiries from prospective bidders; review of contractors’ qualifications and references; preparation of a bid summary; and recommendation of the award to the lowest responsible and qualified bidder. LKB’s construction support services during the ongoing construction phase included review and approval of detailed shop drawings, catalog cuts, and miscellaneous submittals for compliance with contract documents; review and responses to RFI’s (Request for Information) and Change Order Requests; and attendance of progress and project meetings, as necessary.

LKB’s services during construction also included detailed inspection, on-site field testing of materials and other construction activities, including field measurement and collection of data, submission of monthly and final estimates and progress reports, and preparation of record plans showing all changes from the contract plans. The construction management/inspection services included overseeing all construction operations and the placement of Work Zone Traffic Control.

LOCATION

Seaford, NY

CLIENT

Town of Hempstead

COMPLETION

2022