Construction Inspection, Priority Resurfacing, Region 10 header

Construction Inspection, Priority Resurfacing, Region 10

About this Project

The goal of this ongoing project is to increase safety and provide a smooth riding surface for vehicular traffic for the next 10 to 12 years by milling and resurfacing the existing pavement. The roads identified under this project are in the towns of Oyster Bay, Hempstead and Islip, which are only separated by 30 miles. However, the communities and working conditions are extremely diverse, ranging from residential to heavily congested commercial areas. The work also includes extensive Work Zone Traffic Control, including lane closures and nighttime roadway closures with detours. Close coordination with both the Region, local police, other emergency services and the residents and businesses within the work areas must be persistently maintained.

Specific elements of work include:

  • Isolated full depth composite pavement repairs
  • 2” Milling of existing asphalt riding surface and replacement with 2” of new asphalt resurfacing
  • Drainage frame and grate adjustments
  • Utility valve and manhole adjustments
  • Hot mix asphalt overlay
  • New pavement markings
  • Traffic signal loop and traffic count loop replacement
  • Drainage structure cleaning
  • Miscellaneous spot improvements within the State ROW

Location

Towns of Oyster Bay, Hempstead and Islip, Nassau County, NY

Client

New York State Department of Transportation

Completion

Ongoing

Ready to Get Started?

Speak with an Expert

Contact Us