VERTEX’s qualified experts specialize in productivity analysis and frequently utilize industry-standard methodologies that include:
- Measured Mile Analysis
- Comparable Work Study
- Total/Modified Cost
- Industry Productivity Studies (MCAA, etc.)
- Earned Value Analysis