Croton Point Park Bulkhead Reconstruction and Shoreline Stabilization header

About this Project

LKB was retained by Westchester County Department of Public Works to provide design services and construction support services for the replacement of approximately 3,300 feet of steel sheeting in a park on the east bank of the Hudson River. LKB surveyed and inspected the bulkhead, conducted a Phase I archeological investigation of the shoreline, investigated soils, and prepared a design report with recommendations and costs. LKB prepared PS&E documents for the project, located around the area of Enoch’s Neck. The old bulkhead consisted of two sections separated by the Enoch’s Neck which was subject to severe erosion. LKB designed an erosion central mat system to present additional erosion to the steeply sloped terrain leading down to the river. The bulkhead is located along western and northern sides of an active park with picnic grounds, bathing and play areas nearby.

LKB’s construction support services during the construction phase included review and approval of detailed shop drawings, catalog cuts, and miscellaneous submittals for compliance with contract documents; review and responses to RFI’s (Request for Information) and Change Order Requests; and attendance of progress and project meetings, as necessary.

Location

Croton, NY

Client

Westchester County Department of Public Works

Completion

2009

Ready to Get Started?

Speak with an Expert

Contact Us